Project details
As part of the restoration of the school, designated a Texas historic landmark in 1983, Andreola Terrazzo & Restoration provided 20,000 square feet of poured terrazzo flooring.
The work involved floating the concrete substrate with bedding material to restore the correct elevation between two separately-built structures and then marry the two elevations to enable one epoxy terrazzo homogeneous pour.
The work was completed for Bartlett Cocke General Contractors, San Antonio Division.
Location : San Antonio, Texas